Service 32 – Brockham Road Closure from 24th February

Posted on Posted in Service Disruptions, Service Update

Middle Street (between the junction with the Bridge and Brockham Green) will be closed for water main works from Monday 24 February 2020 and re-opening on Saturday 14th March 2020.

During these works service 32 running between Guildford, Dorking, Reigate and Redhill will not be able to serve Brockham Green/Village and Strood Green. The main service 32 will only serve the top half of Brockham Lane (north of the bridge) and the Kiln Lane bus stops (a temporary bus stop will be sited at the Kiln Lane/Brockham Lane junction for travel towards Dorking). On Sundays the regular Stagecoach service 32 will operate the same route as the shuttle service (see below). Bus stops between Dorking Deepdene Roundabout and Kiln Lane/Brockham Lane will not be served on Sundays.

During these works SES Water is funding a FREE SHUTTLE BUS on Monday to Saturday. The Compass Bus shuttle will run direct between Dorking Town Centre, Dorking Station and Strood Green/Brockham Village. It will run on a clockwise loop from Tynedale Road via Middle Street, Wheelers Lane and Wellhouse Lane. A temporary bus stop will be placed on Middle Street just before the junction with Wheelers Lane.

Details of the FREE SHUTTLE BUS and timetable can be fond by clicking HERE